Pennine Building Solutions Logo

FIRST PANELS READY FOR MMU

The first panels are ready for despatch to our project at the MMU Arts and Humanities building.

FIRST PANELS READY FOR MMU

The first panels are ready for despatch to our project at the Manchester Metropolitan University Arts and Humanities building.

Designed by leading architects …. the project features extensive use of GRC cladding elements as part of the envelope cladding system. Manufactured with a lightly textured finish with exposed granite aggregates the GRC has been designed by Syntec GRC and partners Smart Crosby International  to be installed using a “helping hands” vertical and horizontal rail system.